Chongqing pearls stood waiting chair, runs through the scene display: pearls standing next to the three gorges square, pearls stand instead of at the beginning of the site & other
Pearls station & throughout;
。
On December 28, 2012, pearls station transport hub comprehensive renovation project officially started.
On January 25, 2018, put into use.
Pearls railway hub comprehensive renovation project is a key project of the city to implement, is chongqing & other;
Five-year & throughout;
Key construction project of its interior configuration: pearls stand ground floor for the ticket hall, waiting areas and related functional area.
Bus station in the negative layer;
The taxi stand negative layer;
Social vehicles can be parked in the negative three, negative four layers of parking lot;
In addition, the negative four layers also is equipped with high-speed outbound and change to the hall, sharing special car parking lot;
Minus five to eight layer layout social vehicle parking lot and the rail line 9 were not opened at the station.
Waiting area is also equipped with 34 self-help in and out of the station brake machine.
In the waiting area and the platform layer, also equipped with 8 sets of barrier-free elevators escalators, 13.
It selects the waiting chair: 【
Armrest, feet and legs 】
: the use of aluminum alloy materials, large precision casting mold, die-casting molding after polishing directly, electrostatic powder spraying processing.
【
Plate, the back 】
: the 2.
0 mm lengzha steel imports, derusting processing, electrostatic powder spraying.
【
Beam 】
: using hexagonal steel pipe, air-conditioning outdoor painting powder, can withstand the test of the wind, rain and sunshine.
【
Size]
: one: 930 mm * 670 mm * 600 mm: two 930 mm * 670 mm * 1200 mm 3 people: 930 mm * 670 mm * 1800 mm four people: 930 mm * 670 mm * 2400 mm