Chongqing pearls display stand waiting chair

by:OUHE     2020-06-05
Chongqing pearls stood waiting chair, runs through the scene display: pearls standing next to the three gorges square, pearls stand instead of at the beginning of the site & other Pearls station & throughout; 。 On December 28, 2012, pearls station transport hub comprehensive renovation project officially started. On January 25, 2018, put into use. Pearls railway hub comprehensive renovation project is a key project of the city to implement, is chongqing & other; Five-year & throughout; Key construction project of its interior configuration: pearls stand ground floor for the ticket hall, waiting areas and related functional area. Bus station in the negative layer; The taxi stand negative layer; Social vehicles can be parked in the negative three, negative four layers of parking lot; In addition, the negative four layers also is equipped with high-speed outbound and change to the hall, sharing special car parking lot; Minus five to eight layer layout social vehicle parking lot and the rail line 9 were not opened at the station. Waiting area is also equipped with 34 self-help in and out of the station brake machine. In the waiting area and the platform layer, also equipped with 8 sets of barrier-free elevators escalators, 13. It selects the waiting chair: 【 Armrest, feet and legs 】 : the use of aluminum alloy materials, large precision casting mold, die-casting molding after polishing directly, electrostatic powder spraying processing. 【 Plate, the back 】 : the 2. 0 mm lengzha steel imports, derusting processing, electrostatic powder spraying. 【 Beam 】 : using hexagonal steel pipe, air-conditioning outdoor painting powder, can withstand the test of the wind, rain and sunshine. 【 Size] : one: 930 mm * 670 mm * 600 mm: two 930 mm * 670 mm * 1200 mm 3 people: 930 mm * 670 mm * 1800 mm four people: 930 mm * 670 mm * 2400 mm
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...