How does the auditorium seating installation fixed
by:OUHE
2020-06-15
The auditorium seating common fixed four methods: 1.
Concrete: can choose directly impact drill hole, embed pull blasting nut;
2.
Ceramic tile, marble: must choose glass drilling holes to the cement ground, and then use percussion drill hole, embedded pull blasting nut;
3.
Wood floor: use wood drilling drilling, embed pull blasting impact drill hole nut;
4.
Steel, steel plates, use electric drill to drill a 3 - first
After 4 mm holes directly buy self tapping screw [
Iron screw]
, the floor is 30 ~ 40 mm enough can directly benefit, buy self tapping screw fixed on the straight.